For most exhibitors, ordering a custom trade show display 3–4 weeks before you need it in hand is a practical target. This gives you time for display selection, artwork approval, production, shipping, and final inspection before the event.
For larger modular booths, backlit displays, or more complex configurations, starting 4–6 weeks ahead provides additional flexibility.
The key is to plan backward from the date you need the display—not simply from the day your trade show begins.
Important: 5 business days of production does not mean 5 days to delivery. Production begins only after the final artwork and order are approved. Shipping and inspection time come afterward.
How Early Should You Order?
Use the following timeline as a starting point:
| Time Before You Need the Display | Recommendation | What to Expect |
|---|---|---|
| 4–6 weeks | Best for flexibility | More time for booth selection, design revisions, production, and shipping |
| 3–4 weeks | Recommended | Suitable for most standard custom displays when artwork is ready |
| About 2 weeks | Time-sensitive | Confirm production and shipping availability before ordering |
| Under 10 business days | Rush | Availability depends on the display, artwork, and delivery destination |
If your booth has multiple graphic panels, lighting, counters, monitor mounts, or other accessories, allow additional time for design and proof approval.

What Happens Between Ordering and Delivery?
A custom trade show display typically moves through these stages:
Choose → Design → Proof → Approve → Produce → Ship → Inspect
Each stage affects the final delivery date.
1. Choose Your Display
First, confirm your booth size, venue requirements, and the type of display you need.
Westshade offers options including tension fabric displays, modular booths, and backlit configurations, with different solutions for portability, branding, and larger booth setups.
A simple display may require less planning than a larger modular or backlit booth. If you are comparing several configurations, start earlier so the product decision does not delay the artwork stage.

2. Prepare Your Artwork
Once the display is selected, prepare your branding materials.
Have these ready when possible:
-
Logo
-
Brand colors
-
Main headline
-
Product images
-
Website and contact information
-
QR code
-
Other required copy
You do not necessarily need to create the final booth design yourself. Westshade can use your brand materials to prepare a digital proof for review.
The artwork stage can move quickly when the content is ready and feedback is consolidated. Multiple revision rounds or changes to the booth configuration can extend the timeline.
3. Review and Approve the Final Proof
Before production begins, check the final proof carefully.
Confirm:
-
Booth size and configuration
-
Logo and graphic placement
-
Spelling and contact information
-
Website and QR code
-
Graphic panel arrangement
-
Accessories and selected features
Once the final artwork and order are approved, the production clock can begin.
Why 5 Business Days of Production Does Not Mean 5 Days to Delivery
A stated 5-business-day production time refers to the time needed to make your display after the final artwork and order have been approved. It does not include design revisions, shipping, or inspection.
Your actual timeline may look like this:
Artwork & Design
↓
Proof & Approval
↓
Production
↓
Shipping
↓
Inspection
For example, if production takes five business days, you still need additional time for the display to ship to your destination and for you to inspect it before the event.
When planning your deadline, also account for weekends and holidays. For time-sensitive orders, confirm the estimated production and delivery dates for your specific display and delivery ZIP code before ordering.
How Much Time Should You Allow for Different Displays?
The more complex the display, the more planning time you should allow.
Standard Tension Fabric Displays
For a relatively simple branded display with ready-to-use artwork, 3–4 weeks is a practical planning window.
Modular Booths
Larger modular configurations may involve more components, graphic panels, and accessories. Allowing 4 or more weeks gives you more time to finalize the layout and review the proof.
Backlit or Complex Booths
Backlit displays and configurations with multiple accessories may require additional planning. Starting 4–6 weeks ahead is a safer approach.
These are planning guidelines rather than guaranteed delivery times. Always confirm the current schedule for your specific order.

Plan Backward From Your Event Date
Instead of asking:
“When should I place the order?”
start with:
“When do I need the display in my hands?”
For example, if you are traveling to a trade show on Friday, you ideally want enough time before traveling to receive and inspect the display.
A simple planning model looks like this:
Show date
↓
Travel / move-in
↓
Display arrives
↓
Shipping
↓
Production
↓
Final artwork approval
↓
Design and product selection
This approach prevents a common mistake: using the show opening date as the delivery deadline.
What If Your Trade Show Is Less Than Two Weeks Away?
A last-minute order may still be possible, but do not assume that standard production and shipping times will fit your schedule.
Before ordering, provide:
-
Show opening date
-
Date you need the display in hand
-
Delivery ZIP code
-
Booth size
-
Display type
-
Required accessories
-
Current artwork or brand files
To reduce delays:
-
Choose a standard configuration.
-
Have your final copy and images ready.
-
Submit all feedback together.
-
Assign one person to approve the proof.
-
Ask about expedited shipping if necessary.
If a complex booth cannot safely meet the deadline, a simpler display may be a more practical option for the immediate event.
Trade Show Display Ordering Checklist
Before placing your order, confirm:
-
Show date: When does the event begin?
-
Move-in date: When can you access the booth space?
-
In-hand date: When do you need the display?
-
Display type: Which system fits your booth?
-
Artwork: Are your logo, copy, and images ready?
-
Production: When can production begin after approval?
-
Shipping: How long is delivery expected to take?
-
Inspection: Do you have time to check the display before the event?
Start Planning Before the Deadline
The safest way to plan a custom trade show display is to work backward from the date you need it in hand. For most standard displays, 3–4 weeks is a practical starting point. Larger modular booths, backlit displays, and more complex configurations may require 4–6 weeks or more.
Keep in mind that production is only one part of the process. Display selection, artwork approval, production, shipping, and inspection all need to fit into your timeline.
If your event is approaching, have your booth size, event date, delivery ZIP code, and preferred display type ready. This information can help determine which display and timeline are realistic for your event.